Kramertunnel
The Kramertunnel, which is to be constructed using mining techniques, with a length of 3.6 kilometres, is the main element of the 5.6 kilometre long bypass west of the city of Garmisch, which will be connected to the federal route B23 in the north. The opening to traffic is expected in 2024 and will then reduce through traffic in the centre of Garmisch.
Client
Staatliches Bauamt Weilheim
Construction Period
2019 - 2024
Brief
Site management and site supervision in an engineering consortium