Moehne dam basket rake
The waterside pipeline section of the power plant pipeline of the Moehne dam has to be inspected every 10 years while dry. With the planned extension of the basket rake for the repair of the roller gate of the power plant pipeline, adjustments to the rake would be possible, which could opti-mize the salvage costs in the future. EDR was commissioned to prepare a feasibility study for the modification/renewal of the basket rake.
Client
Lister- und Lennekraftwerke GmbH
as a subsidiary of the Ruhrverband
Construction period
2023
Brief
FEAS